Besu : 2024-06-11 Contributor Call - US/EMEA


(Meeting Link: ⁨https://zoom.us/j/97540031823?pwd=dEJrRW1LakFlWnZPelI3VGxoVjg2dz09)

EMEA Friendly Time (https://www.timeanddate.com/worldclock/converter.html?iso=20220607T150000&p1=224&p2=179&p3=1440&p4=195&p5=47)

  • 8 am Tuesday Los Angeles time
  • 11 am Tuesday New York time
  • 17h Tuesday Paris time

Agenda

  •  Housekeeping
  • Release updates / issues 
    • 24.6.0 in burn-in phase for release 
    • Besu-Native (Gary and Matt Whitehead on action items) 
      • Some workarounds for current issues with release and local build.
      • How does this supply chain work so vendors and users can reliably build from specific commits against Besu-Native versions? 
        • Checks in the artifacts? Maven/JFrog/GHA? 
        • Need to review the code for verification of native in Besu-Main.
      • Besu-Native should now automatically derive a CalVer release from when it was built to avoid the overwrite problem of previous versions. 
        • Should target the same changes to release updates / GHA. 
        • Gradle properties file needs to be manually up-revved when a new version is being cut. 
        • Gary to take point on this. 
      • Maven should stop a version being released.
  • Work Updates
  • Other Business
  • Open Forum
    • /add item/
  • Future Topics
    • /add item/

Recordings

Find the recording in the playlist - https://www.youtube.com/playlist?list=PL0MZ85B_96CHpqsKmljUK8HB98wK67RjC

  File Modified
No files shared here yet.
  • Drag and drop to upload or browse for files